{"id":224,"date":"2026-07-30T15:07:22","date_gmt":"2026-07-30T15:07:22","guid":{"rendered":"https:\/\/powerbim.com\/proyectos\/powerbim-for-zalando-se\/"},"modified":"2026-10-06T08:39:40","modified_gmt":"2026-10-06T08:39:40","slug":"powerbim-for-zalando-se","status":"publish","type":"proyectos","link":"https:\/\/powerbim.com\/en\/projects\/powerbim-for-zalando-se\/","title":{"rendered":"POWERBIM for Zalando SE"},"content":{"rendered":"\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-1\" style=\"text-transform:uppercase\">The Strategy<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\">Comprehensive BIM roadmap and asset management for logistics centers<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\">The project aims to provide Zalando SE with the best strategy for implementing the BIM methodology at a corporate level, extending it to all stakeholders involved in the lifecycle of their logistics assets, warehouses, and offices. A structured roadmap is defined, covering everything from drafting information standards to real-time operational connection. The global scope comprises six key methodological pillars: 1) Development of Employer Information Requirements (EIR) and technical documentation; 2) Corporate BIM implementation and training workshops; 3) LOD300 digital modeling for logistics centers; 4) BIM strategy for FM and integration with CAFM systems; 5) Immersive interactive BIM-VR application<br\/>; and 6) POWERBIM prototyping connected to technical building management systems (BMS and IoT).       <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The scope of work is divided into several areas:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>EIR DEVELOPMENT + COMPLEMENTARY DOCUMENTATION<\/strong><\/li>\n\n\n\n<li><strong>BIM IMPLEMENTATION WORKSHOPS<\/strong><\/li>\n\n\n\n<li><strong>BIM MODELING FOR LOGISTICS CENTER \u2013 LOD300<\/strong><\/li>\n\n\n\n<li><strong>BIM FOR FM AND CAFM INTEGRATION<\/strong><\/li>\n\n\n\n<li><strong>INTERACTIVE BIM-VR APPLICATION<\/strong><\/li>\n\n\n\n<li><strong>POWERBIM PROTOTYPE FOR CAFM \u2013 BMS \/ IOT<\/strong><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"537\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando-1024x537.png\" alt=\"\" class=\"wp-image-482\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando-1024x537.png 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando-300x157.png 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando-768x402.png 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando-1536x805.png 1536w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/powerbim-zalando.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Forge Partner Talks: Operations, Maintenance, and Logistics\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/2fsKRIwhlss?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<div class=\"wp-block-group has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-9c325150 wp-block-group-is-layout-constrained\" style=\"border-top-left-radius:12px;border-top-right-radius:12px;border-bottom-left-radius:12px;border-bottom-right-radius:12px;background-color:#fffbfb12;padding-top:var(--wp--preset--spacing--40);padding-right:var(--wp--preset--spacing--50);padding-bottom:var(--wp--preset--spacing--40);padding-left:var(--wp--preset--spacing--50)\">\n<h4 class=\"wp-block-heading\">Developed Technologies<\/h4>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-1&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-1-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-1\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">BIM Standardization and Technical Documentation (EIR)<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-1\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-1-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Development of Employer&#8217;s Information Requirements (EIR) and complementary documentation to define the methodological framework and coordinate all stakeholders involved in Zalando SE projects.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-2&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-2-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-2\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">3D Logistics BIM Modeling (LOD 300)<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-2\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-2-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Creation of digital models for logistics centers, warehouses, and offices with an LOD 300 level of detail, serving as a structured geometric and informational foundation for operation.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-3&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-3-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-3\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">BIM Auditing and Data Validation (POWERBIM)<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-3\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-3-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Implementation of tools for automatic data verification against the BEP (BIM Execution Plan) and integration of Clash Detection reports.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-4&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-4-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-4\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">BIM Integration for FM and CAFM<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-4\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-4-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Connecting BIM model information with Computer-Aided Facility Management (CAFM) systems to optimize the operation and maintenance of assets (Facility Management).<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-5&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-5-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-5\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Interactive BIM-VR Application<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-5\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-5-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Development of an immersive environment using Virtual Reality (VR) integrated with the BIM model to facilitate visualization, understanding of logistics design, and decision-making.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-6&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-6-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-6\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">POWERBIM Prototype for CAFM \/ BMS \/ IoT<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-6\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-6-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Real-time integration of BIM model data with Building Management Systems (BMS) and IoT sensors for advanced and preventive monitoring of the logistics center.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Comprehensive BIM6D strategy development for Zalando SE: data auditing, BIM-VR models, and POWERBIM prototyping connected to CAFM\/BMS systems to optimize the lifecycle of their logistics facilities.<\/p>\n","protected":false},"featured_media":782,"template":"","class_list":["post-224","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"version-history":[{"count":3,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/224\/revisions"}],"predecessor-version":[{"id":780,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/224\/revisions\/780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/media\/782"}],"wp:attachment":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/media?parent=224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}