{"id":230,"date":"2026-07-06T07:50:53","date_gmt":"2026-07-06T07:50:53","guid":{"rendered":"https:\/\/powerbim.com\/proyectos\/hospitals-4-0\/"},"modified":"2026-08-18T13:17:57","modified_gmt":"2026-08-18T13:17:57","slug":"hospitals-4-0","status":"publish","type":"proyectos","link":"https:\/\/powerbim.com\/en\/projects\/hospitals-4-0\/","title":{"rendered":"Hospitals 4.0"},"content":{"rendered":"\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-1\" style=\"text-transform:uppercase\">The Challenge<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\">Project Overview<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-color has-link-color wp-elements-2 wp-block-paragraph\" style=\"color:#ffffff\">As <strong>Alfonso Sanahuja<\/strong>, from the Terrassa Health Consortium, states:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-style-default has-white-color has-text-color has-link-color wp-elements-3 is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">During the pandemic, difficult situations arose due to the lack of long-term planning for clinical resources and on-demand equipment. With Hospitals 4.0, we have a tool to anticipate new pandemics and simulate critical scenarios with confidence. <\/p>\n<\/blockquote>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.linkedin.com\/in\/fredericgilbanus\/\"><strong>Frederic Gil Ban\u00fas<\/strong><\/a>, Head of MEP and Smart Building at BIM6D, explains:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">We joined forces with the work teams involved in the project to develop a pilot project for critical ICU spaces at Terrassa Hospital. We integrated a digital twin into POWERBIM that included boxes, spaces, and specialized equipment, connected to medical inventory, clinical histories, and technical maintenance information for the equipment. The ambitious goal was to predict future complications and needs, while also simulating possible alternative solutions. Thanks to technologies such as artificial intelligence algorithms, machine learning, and simulations, we can foresee the need and availability of boxes, beds, equipment, and resources required based on hospital admission pathologies, as well as predict and anticipate their availability. This achieves predictive maintenance, reduces corrective maintenance, optimizes operating costs, and improves healthcare and patient safety.   <\/p>\n<\/blockquote>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-embed is-type-video is-provider-vimeo wp-block-embed-vimeo wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"hospitals_40\" src=\"https:\/\/player.vimeo.com\/video\/733898231?dnt=1&amp;app_id=122963\" width=\"500\" height=\"281\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<div class=\"wp-block-group has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-9c325150 wp-block-group-is-layout-constrained\" style=\"border-top-left-radius:12px;border-top-right-radius:12px;border-bottom-left-radius:12px;border-bottom-right-radius:12px;background-color:#fffbfb12;padding-top:var(--wp--preset--spacing--40);padding-right:var(--wp--preset--spacing--50);padding-bottom:var(--wp--preset--spacing--40);padding-left:var(--wp--preset--spacing--50)\">\n<h4 class=\"wp-block-heading\">Tecnolog\u00edas desarrolladas<\/h4>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-1&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-1-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-1\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Extracci\u00f3n y Generaci\u00f3n de Informes Automatizados<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-1\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-1-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Proceso simplificado que permite subir un modelo digital a la plataforma POWERBIM, extraer sus bases de datos en segundos y generar cuadros de mando ejecutivos. Los<br>usuarios pueden personalizar y reutilizar estas plantillas para m\u00faltiples proyectos.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-2&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-2-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-2\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Mediciones y Presupuestos 5D con Un Solo Clic<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-2\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-2-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Obtenci\u00f3n instant\u00e1nea de mediciones y presupuestos del proyecto desde el propio navegador, eliminando la necesidad de software 5D especializado. Permite recalcular costes autom\u00e1ticamente ante cualquier actualizaci\u00f3n del modelo BIM.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-3&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-3-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-3\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Sincronizaci\u00f3n de Datos Externos v\u00eda Microsoft SharePoint<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-3\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-3-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Integraci\u00f3n pionera de tablas Excel alojadas en SharePoint con los componentes del modelo BIM. Permite a varios usuarios editar par\u00e1metros externos en tiempo real e integrarlos en la base de datos del activo digital.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-4&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-4-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-4\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Auditor\u00eda de Datos y Cumplimiento de Reglas (EIR \/ BEP)<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-4\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-4-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Verificaci\u00f3n de la calidad de los datos del modelo BIM mediante conjuntos de reglas configurables basadas en los Requisitos de Informaci\u00f3n del Cliente (EIR) o el Plan de Ejecuci\u00f3n BIM (BEP), incluyendo comprobaciones de llenado de atributos en tiempo real.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-5&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-5-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-5\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Dashboards Interactivos y Filtrado Multicriterio<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-5\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-5-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Visualizaci\u00f3n anal\u00edtica que permite a los t\u00e9cnicos filtrar los elementos por nivel, disciplina o zona, seleccionar componentes en el gr\u00e1fico, aislarlos en el visor 3D y generar grupos de trabajo para su revisi\u00f3n colaborativa.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-6&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\" style=\"border-top-left-radius:1px;border-top-right-radius:1px;border-bottom-left-radius:1px;border-bottom-right-radius:1px;border-top-style:none;border-top-width:0px;border-right-style:none;border-right-width:0px;border-bottom-color:#ffffff54;border-bottom-style:dotted;border-bottom-width:1px;border-left-style:none;border-left-width:0px\">\n<h3 class=\"wp-block-accordion-heading has-icon has-icon-right has-md-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-6-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" id=\"accordion-item-6\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">Gesti\u00f3n de Incidencias y Est\u00e1ndares openBIM (BCF)<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div aria-labelledby=\"accordion-item-6\" data-wp-bind--hidden=\"state.isHidden\" data-wp-on--beforematch=\"actions.handleBeforeMatch\" id=\"accordion-item-6-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">M\u00f3dulo de comunicaci\u00f3n colaborativa que permite crear, asignar y hacer seguimiento de incidencias directamente sobre el modelo 3D, exportando e importando informes en est\u00e1ndar BCF para la coordinaci\u00f3n entre ingenier\u00edas.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:30px\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-4\" style=\"text-transform:uppercase\">Advantages<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\">Three benefits, one a consequence of the other<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Miguel Delgado<\/strong>, from the Polytechnic University of Catalonia, summarizes the impact compared to current asset and maintenance management systems as follows:<\/p>\n\n\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-container-core-group-is-layout-5db0016e wp-block-group-is-layout-constrained\" style=\"padding-right:16rem;padding-left:16rem\">\n<div class=\"wp-block-columns has-border-color has-background is-layout-flex wp-container-core-columns-is-layout-1c666923 wp-block-columns-is-layout-flex\" style=\"border-color:#ffffff26;border-width:1px;border-top-left-radius:16px;border-top-right-radius:16px;border-bottom-left-radius:16px;border-bottom-right-radius:16px;background-color:#ffffff0d\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"padding-top:20px;padding-right:20px;padding-bottom:20px;padding-left:20px\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-5\" style=\"text-transform:uppercase\">01<\/h5>\n\n\n\n<h4 class=\"wp-block-heading\">Reduction of Maintenance Costs<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Optimal time windows for preventive maintenance are predicted, and the number of corrective interventions is reduced.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"padding-top:20px;padding-right:20px;padding-bottom:20px;padding-left:20px\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-6\" style=\"text-transform:uppercase\">02<\/h5>\n\n\n\n<h4 class=\"wp-block-heading\">Increased Resource Availability<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The mean time between failures increases, and the lifespan of critical beds, boxes, and equipment is extended.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"padding-top:20px;padding-right:20px;padding-bottom:20px;padding-left:20px\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-7\" style=\"text-transform:uppercase\">03<\/h5>\n\n\n\n<h4 class=\"wp-block-heading\">Greater Operational Efficiency<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">A direct consequence of the previous two: lower operating costs for greater service availability.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n<div class=\"wp-block-group alignfull has-background has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"background-color:#ffffff0f;margin-top:30px\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Helena P\u00e9rez<\/strong>, from CadTech Ib\u00e9rica, says:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Ultimately, any sector, hospital or otherwise, whose facilities are critical and depend on high-demand equipment, can benefit from these experimental development technologies within the scope of our project. HOSPITALS 4.0 also offers potential assistance to other areas of the hospital, such as reducing waiting times, improving the patient experience, and predicting future needs. <\/p>\n<\/blockquote>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"772\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-concesion.webp\" alt=\"\" class=\"wp-image-90\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-concesion.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-concesion-300x226.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-concesion-768x579.webp 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:60px\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-8\" style=\"text-transform:uppercase\">The Digital Twin, Inside Out<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\">Platform Screenshots<\/h2>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-4 is-cropped wp-block-gallery-7 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"828\" data-id=\"94\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb5-1024x828.webp\" alt=\"\" class=\"wp-image-94\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb5-1024x828.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb5-300x243.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb5-768x621.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb5.webp 1196w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"518\" data-id=\"93\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3-1024x518.webp\" alt=\"\" class=\"wp-image-93\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3-1024x518.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3-300x152.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3-768x388.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3-1536x777.webp 1536w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb3.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"501\" data-id=\"92\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2-1024x501.webp\" alt=\"\" class=\"wp-image-92\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2-1024x501.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2-300x147.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2-768x376.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2-1536x751.webp 1536w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb2.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"502\" data-id=\"91\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1-1024x502.webp\" alt=\"\" class=\"wp-image-91\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1-1024x502.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1-300x147.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1-768x376.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1-1536x753.webp 1536w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb1.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"518\" data-id=\"89\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4-1024x518.webp\" alt=\"\" class=\"wp-image-89\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4-1024x518.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4-300x152.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4-768x388.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4-1536x777.webp 1536w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-4.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"795\" height=\"386\" data-id=\"88\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/220722_HOSPITALES-4-high.gif\" alt=\"\" class=\"wp-image-88\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"891\" data-id=\"95\" src=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb6-1024x891.webp\" alt=\"\" class=\"wp-image-95\" srcset=\"https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb6-1024x891.webp 1024w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb6-300x261.webp 300w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb6-768x668.webp 768w, https:\/\/powerbim.com\/wp-content\/uploads\/2026\/07\/proyecto-hospitales-4-0-pwb6.webp 1153w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:100px\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-embed is-type-video is-provider-vimeo wp-block-embed-vimeo wp-embed-aspect-18-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"220722_HOSPITALES 4\" src=\"https:\/\/player.vimeo.com\/video\/732580908?dnt=1&amp;app_id=122963\" width=\"500\" height=\"242\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe>\n<\/div><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h5 class=\"wp-block-heading has-custom-pwb-primary-color-color has-text-color has-link-color wp-elements-9\" style=\"text-transform:uppercase\">Digital Twin as a Service<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\">POWERBIM as an Integrating Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">POWERBIM has served as the layer that structures and classifies all BIM information for the project, and the interactive database where simulations and results are cross-referenced.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One of its most powerful capabilities is creating custom analytics templates that automate the workflow and allow for &#8216;replaying&#8217; the simulation along the timeline to compare, analyze, and decide.<\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p><strong>Hospitals 4.0<\/strong> integrates a digital twin and Machine Learning to address the lack of clinical planning experienced during the pandemic. Through simulations of critical scenarios and artificial intelligence, the tool predicts ICU resource demand and optimizes predictive maintenance, thereby reducing operating costs, increasing equipment availability, and ensuring better healthcare in future crises. <\/p>\n","protected":false},"featured_media":231,"template":"","class_list":["post-230","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"version-history":[{"count":1,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/230\/revisions"}],"predecessor-version":[{"id":232,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/proyectos\/230\/revisions\/232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/media\/231"}],"wp:attachment":[{"href":"https:\/\/powerbim.com\/en\/wp-json\/wp\/v2\/media?parent=230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}