The Strategy
Comprehensive BIM roadmap and asset management for logistics centers
The project aims to provide Zalando SE with the best strategy for implementing the BIM methodology at a corporate level, extending it to all stakeholders involved in the lifecycle of their logistics assets, warehouses, and offices. A structured roadmap is defined, covering everything from drafting information standards to real-time operational connection. The global scope comprises six key methodological pillars: 1) Development of Employer Information Requirements (EIR) and technical documentation; 2) Corporate BIM implementation and training workshops; 3) LOD300 digital modeling for logistics centers; 4) BIM strategy for FM and integration with CAFM systems; 5) Immersive interactive BIM-VR application
; and 6) POWERBIM prototyping connected to technical building management systems (BMS and IoT).
The scope of work is divided into several areas:
- EIR DEVELOPMENT + COMPLEMENTARY DOCUMENTATION
- BIM IMPLEMENTATION WORKSHOPS
- BIM MODELING FOR LOGISTICS CENTER – LOD300
- BIM FOR FM AND CAFM INTEGRATION
- INTERACTIVE BIM-VR APPLICATION
- POWERBIM PROTOTYPE FOR CAFM – BMS / IOT

Developed Technologies
Development of Employer’s Information Requirements (EIR) and complementary documentation to define the methodological framework and coordinate all stakeholders involved in Zalando SE projects.
Creation of digital models for logistics centers, warehouses, and offices with an LOD 300 level of detail, serving as a structured geometric and informational foundation for operation.
Implementation of tools for automatic data verification against the BEP (BIM Execution Plan) and integration of Clash Detection reports.
Connecting BIM model information with Computer-Aided Facility Management (CAFM) systems to optimize the operation and maintenance of assets (Facility Management).
Development of an immersive environment using Virtual Reality (VR) integrated with the BIM model to facilitate visualization, understanding of logistics design, and decision-making.
Real-time integration of BIM model data with Building Management Systems (BMS) and IoT sensors for advanced and preventive monitoring of the logistics center.